HomeRFPs PROJECT NUMBER 181481, Camp Creek, Zumwalt Prairie Preserve, OR Camp Creek Machine Control Online
   
PROJECT NUMBER 181481, Camp Creek, Zumwalt Prairie Preserve, OR Camp Creek
Written by U.S. Army Corps of Engineers
Friday, 11 December 2009
RECOVERY--Z--PROJECT NUMBER 181481, Camp Creek, Zumwalt Prairie Preserve, OR Camp Creek, Zumwalt Prairie Preserve
This opportunity is a Recovery and Reinvestment Act action
Agency: Department of the Army
Office: U.S. Army Corps of Engineers
Location: USACE District, Walla Walla
The intent of this project is to remove earthen dams that form the ponds in Camp Creek and to restore the creek to a more natural condition. The creek is typically dry during the months of July and August. The ponds were created to hold water for livestock to drink during the dry months of the year. The work on ponds 1, 6, 7, 8, 9, 13 and 18 include dam removal, excavation, fill, grading and stream restoration. The work on ponds 10, 15, 16, 20 and 21 includes dam removal, excavation, fill, grading, stream restoration, placement of woody debris, placement of rock and a culvert replacement. The in-water work window for Camp Creek is July 1, 2010 through October 31, 2010.